Our works

WHAT WE DO

MW Engenharia is more than a name, it is the expression of a conviction that permeates the principle of its work: respect for the client and the understanding that each project is truly unique and solutions must be found together.

 

It is with this philosophy that MW Engenharia operates in the area of infrastructure through the assembly and supply of a series of systems. From power substation systems to contract management and administration.

METRORAILWAY SIGNALING SYSTEMS

Client: BOMBARDIER / ALSTOM

Scope: Execution of installation services for the modernization of the CBTC signaling and centralized control system in the stations and tracks of Line 5 – Lilac – Phases 1 and 2 – São Paulo METRO.

 

Client: BOMBARDIER

Scope: Execution of installation services for the signaling and centralized control system in stations and elevated tracks of the Line 15 Monorail – Silver – São Paulo METRO.

Client: ALSTOM

Scope: Execution of installation services for the modernization of the CBTC signaling and centralized control system in the stations and tracks of Line 1 – Blue – São Paulo METRO.

METRORAILWAY TELECOMMUNICATION SYSTEMS

Client: SCHNEIDER ELECTRIC

Scope: Execution of installation and assembly services for all telecommunications systems in stations and tracks on Line 5 – Lilac – São Paulo METRO.

Client: ALSTOM

Scope: Execution of installation and assembly services of all telecommunications systems in stations and tracks of Line 1 – Blue – São Paulo METRO.

Client: POWERWAVE / OI

Scope: Implementation of mobile phones in tunnels and stations on Lines 1 – Blue, 2 – Green, 3 – Red and 4 – Yellow of the São Paulo METRO.

ELECTROMECHANICAL SYSTEMS

Client: ALSTOM

Scope: Electromechanical assembly of traction, medium voltage, low voltage, auxiliary, telecommunications, fire detection and grounding systems in stations, tracks and pits of Line 4 – Yellow –  São Paulo METRO.

Client: EFACEC

 

Scope: Electromechanical assembly of lighting systems, outlets, pumps, fire detection and cable tray system in stations, roads and pits of Line 2 – Green – São Paulo METRO.

Client: CONDUCTIX / OAS / QUEIROZ GALVÃO /CMSP

Scope: Electromechanical assembly of the 3rd and 4th conductive rails on the elevated tracks of Monorail of Line 15 – Silver of São Paulo METRO.

Client: ALSTOM

Scope: Electromechanical assembly of auxiliary systems and main ventilation in stations on Line 1 – Blue and Line 4 Yellow of São Paulo METRO.

Client: BOMBARDIER

Scope: Electromechanical assembly of the energy regeneration system – AARU in the Monorail stations of Line 15 – Silver of São Paulo METRO.

Cliente: THYSSENKRUPP

Escopo: Montagem eletromecânica dos sistemas elétricos de baixa tensão e comando de escadas rolantes e elevadores nas estações das Linhas 4 – Amarela e Linha 5 Lilás do METRÔ de São Paulo.

Client: THYSSENKRUPP

Scope: Electromechanical assembly of low voltage electrical systems and control of escalators and elevators at stations of Line 4 – Yellow and Line 5 – Lilac of São Paulo METRO.

Client: BOMBARDIER

Scope: Electromechanical assembly of the platform door system at stations of Line 5 – Lilac of São Paulo METRO.

Client: ODEBRECHT / METRÔ RIO.

Scope: Electromechanical assembly of cable tray system, low voltage, lighting and sockets at General Osório II station of Rio de Janeiro – RJ METRO.

Cliente: VIAMOBILIDADE

Escopo: Implantação de pontos comerciais nas estações da Linha 5 – Lilás do METRÔ de São Paulo.

RAILWAY SIGNALING SYSTEMS

Client: EFACEC

Scope: Execution of installation services for CBTC signaling and centralized control system in stations and tracks of Line 7 – Ruby of Companhia Paulista de Trens Metropolitanos – CPTM.

Client: EFACEC

Scope: Execution of installation services for CBTC signaling and centralized control system at stations and tracks of Line 12 – Sapphire of Companhia Paulista de Trens Metropolitanos – CPTM.

Client: ALSTOM

Scope: Elaboration of executive projects for installation and assembly, execution of installation services for the signaling system and centralized CBTC control in the stations and tracks of Line 9 – Emerald of Companhia Paulista de Trens Metropolitanos – CPTM.

Client: SIEMENS

Scope: Execution of underground pipeline network, road crossings, viaducts and bridges along line 10 – Turquoise of Companhia Paulista de Trens Metropolitanos – CPTM.

POWER SUBSTATIONS - ELECTROMECHANICAL ASSEMBLIES

Client: ETES – Empresa de Transmissão do Espírito Santo S.A.

Scope: Execution of civil works and electromechanical assembly of the Verona substation, comprising 02 spans of 230 kV.

Client: ETES – Empresa de Transmissão do Espírito Santo S.A.

Scope: Execution of civil works and complete electromechanical assemblies of 01 span of 230 kV – Mascarenhas / ES.

Client: Empresa Brasileira de Transmissão de Energia S/A. – EBTE.

Scope: Execution of civil works and complete electromechanical assemblies at Substation 230/138/13.8kV – Parecis / MT.

Client: SVC / AREVA / ANGLO AMERICAN.

 Scope: Construction and assembly of SVC (static reactive compensator) – Barro Alto – Goiás – GO

OTHER WORKS PERFORMED

Client: CCV – CONSÓRCIO CONSTRUTOR VIRACOPOS.

Scope: Assembly of medium and low voltage electrical systems for the works of the new passenger terminals – Viracopos Airport – Campinas.

Client: CONCESSIONÁRIA VIA RIO.

Scope: Electromechanical assembly of the main ventilation systems, CCTV, monitoring, traffic lights, gates and fire doors on Transolímpica road in Rio de Janeiro Rio de Janeiro – RJ.

[]